2000 meters WIFI module remote image transfer module to help tunnel construction

2023-03-20 580

In recent years, the construction of highway and railway in China has realized the leapfrog development, which directly contributes to the improvement of the overall economic strength. In our country, the construction of tunnel is necessary for the construction of highway and railway because of complex geographical environment. But the tunnel construction environment is complicated, there are many hidden works, and the supervision is difficult. According to the requirements of "Technical Specifications for Highway Tunnel Construction", the construction site must be monitored in real time during the implementation of tunnel construction. Today, we will learn about the important application of field monitoring in the Cangshan Tunnel monitoring project.

2000 meters WIFI module remote image transfer module to help tunnel construction

Project introduction

Expressway Cangshan is ready to blast after a palm face, which means the entire Cangshan tunnel is about to be fully connected. In the blasting process, the real-time monitoring of the blasting environment should be realized.


On-site demand

The actual site is two 10km construction tunnels, and the customer needs to carry out 7×24 hours video monitoring on the construction progress, safety and construction specifications of the inner palm surface of the tunnel. At the same time, because there is no operator signal in the tunnel and the distance is too far, it is impossible to contact through intercom. Therefore, the tunnel network needs to be transmitted to the tunnel to carry out WIFI coverage of long-distance image transfer module of WIFI module at 2000 meters, so that the construction personnel in the tunnel can contact with external management personnel.


Due to the practical application of tunnel in construction, the tunnel face will burst from time to time. In this case, the traditional equipment can not meet the field conditions, the explosion-proof wireless is needed to deal with the palm surface blasting produced by the air wave and gravel impact. Therefore, the remote image transfer module of 2000 meters WIFI module can be used in complex tunnel environment, taking into account high bandwidth and stability.


Specific implementation plan introduction:

The whole length of the tunnel is 10KM. Due to the large construction vehicles in the tunnel, they should be installed at a higher position on the side wall of the tunnel to avoid signal attenuation caused by the congestion of the large vehicles. Specific configurations are as follows:


Front end point: There are three points at the front end, which are located at 2KM of the tunnel, 5KM of the tunnel and the palm of the tunnel. The remote image transmission module of the WIFI module of 2000 meters is transmitted to the relay point for configuration and reception, and the palm monitoring device moves forward with the construction progress.


Relay points: Because the tunnel is not a straight line and the bend of 5km is large, it is impossible to realize the condition of unobblocking access. It is necessary to add relay points at 5km of the tunnel to receive video surveillance data of the front three points and transmit the Internet to the front three points for AP coverage. Here equipped with 2000 meters WIFI module remote image transmission module omnidirectional antenna.


Rear endpoint: At the entrance of the tunnel, the remote image transfer module equipped with a WIFI module of 2000 meters receives data from the relay point, and then transmits it to the switch in the equipment room through the network cable, which is displayed in real time on the monitor in the equipment room for 7 x 24 hours monitoring.


Through the remote image transfer module of 2000-meter WIFI module, the palm surface blasting project of Cangshan Tunnel is successfully completed, and the high-speed Cangshan Tunnel is fully through. In addition, the use of wireless intelligent video monitoring technology in tunnel construction can reduce the manpower to guard materials, improve the efficiency of workers, reduce construction costs under the premise of ensuring the quality and safety of the project, and has good practicability.


免费观看a级片| 久久精品国产欧美日韩| 亚洲欧好州第一的日产suv| 少妇高潮喷水久久久久久久久久 | 久久综合亚洲欧美成人| 青青草APP| 被黑人伦流澡到高潮hnp动漫| 国产第一页屁屁影院| 我才12因啪啪就破了处怎么办| 被多个男人调教奶头玩奶头| 隔壁邻居是巨爆乳寡妇| 美女视频黄是免费| 精人妻无码一区二区三区| 777米奇色狠狠888俺也去乱| 久久精品国产亚洲av日韩| 无码人妻熟妇av又粗又大| 国产成人一区二区三区影院动漫| 中文字幕在线看成电影乱码| 三个黑人跟一个女人xxoo| 国产三级在线观看完整版| 在厨房我撕开岳的丁字裤| 无码av一区二区三区| 夜月直播下载| 国产露脸精品产三级国产av| 中文字幕爆乳julia女教师| 成人免费a级毛片无码片| 亚洲精品巨爆乳无码大乳巨| 国产av一区二区三区日韩| 白少洁第1一40章免费阅读| 玩50岁四川熟人A片| 警花新婚尝又大又粗| 免费观看完整视频app| 婷婷五月综合缴情在线视频| 国产无遮挡又黄又爽在线观看| 韩国精品无码少妇在线观看| 男人撕开奶罩揉吮奶头gif| LASTDAYONEARTH狗| 女女女女bbbbbb毛片在线| 亚洲AV天堂AV在线成人播放| 色哟哟视频免费入口在线看| 国产69精品久久久久9999不卡|